We classify hazardous areas, calculate dilution ventilation and specify the conditions under which a room is not an explosion-hazard room. Assessment, Explosion Protection Document and design guidance from one team.
From calculations to documents. No hand-offs between firms: ventilation calculations, the assessment and guidance for designers come from one team.
Request an assessmentExplosion-hazard rooms and spaces, hazardous area drawings and ignition sources.
Risk assessment, protective measures and inspection intervals for the employer.
Gases and vapours: Zones 0, 1, 2. Dusts: Zones 20, 21, 22.
Degree of dilution, availability of ventilation and required airflow rates.
Alarm thresholds, emergency ventilation, gas and power supply shut-off.
Supply and extract locations, Ex-rated equipment, clauses for the detailed design.
An explosion-hazard room means cost for the client and constraints across the whole building. Before classifying a room, we check by calculation whether ventilation and controls can rule that classification out.
Three plant rooms on a basement storey of an office tower, housing air conditioning units with the flammable refrigerant R-32. For the net volume, after deducting the switchgear, the pressure rise in one of them came out at 5.33 kPa, above the 5 kPa threshold.
Classification as an explosion-hazard room would have required a new fire compartment in the high-rise building. R-32 is heavier than air and accumulates at floor level, so the solution was low-level extract of at least 155 m³/h. The condition went into the detailed design, with no change to the building layout.
For complex geometry we check gas concentration distribution with a CFD simulation, and for LPG tanks outside buildings we carry out LPG hazard analyses.
In Poland these are two documents under two separate legal regimes: fire safety and health and safety at work (ATEX Workplace Directive 1999/92/EC). We prepare both, so that the zones and protective measures in them are the same.
| Aspect | Explosion risk assessment | Explosion Protection Document |
|---|---|---|
| Legal basis | Polish Regulation of the Minister of the Interior and Administration of 7 June 2010 on fire protection of buildings, other structures and sites, § 37 | Polish Regulation of the Minister of Economy of 8 July 2010 on minimum health and safety requirements for workplaces where an explosive atmosphere may occur (transposing Directive 1999/92/EC) |
| Responsible party | The developer, designer or user who determines the process | The employer, before the workplace is put into use |
| Content | Explosion-hazard rooms, zones with drawings, factors that may cause ignition | Risk assessment, protective measures, list of zones, inspection intervals, coordination rules for multiple employers |
| Revision | We recommend a review at every change of process, substance or ventilation | Without delay after a change to the workplace, equipment or work organisation |
Inventory of flammable substances, potential release points and grades of release: continuous, primary and secondary.
Degree of dilution and availability of ventilation per Annex C of PN-EN IEC 60079-10-1, with the required airflow rate.
Check against the 5 kPa threshold for the net room volume, after deducting fit-out and equipment.
Zone type and extent on plans and sections, with the location of release sources.
Extract rate and location, gas detection, controls and emergency power, written so that the services designer can transfer them directly.
For workplaces: risk assessment and protective measures based on the assessment results.
Standards: PN-EN IEC 60079-10-1 (gases), PN-EN 60079-10-2 (dusts), PN-EN 1127-1, PN-EN 60079-14 (equipment selection).
FAQ
In Poland the explosion risk assessment derives from fire safety regulations and identifies explosion-hazard rooms, zones and ignition sources. The Explosion Protection Document (EPD) derives from health and safety law (Directive 1999/92/EC) and describes how the employer protects workers in those zones. A workplace usually needs both, and the assessment is the starting point for the EPD.
Under the Polish regulation on fire protection of buildings, the assessment is made by the developer, designer or user who determines the process. The Explosion Protection Document is prepared by the employer before the workplace is put into use.
No. The assessment decides: the type and location of possible releases, ventilation and the pressure rise in a potential explosion. Under Polish regulations an explosion-hazard room is one in which an explosion of the mixture could cause a pressure rise above 5 kPa. With proper ventilation and gas detection, many boiler rooms stay below this threshold.
In principle, yes. Properly designed dilution ventilation, with extract where the gas accumulates, can reduce the zone to negligible extent or keep the pressure rise below 5 kPa. This must, however, be demonstrated by calculation, and the conditions carried over into the design and controls.
It depends on the refrigerant charge, room volume and ventilation. With a small charge in a large room, a calculation confirming this is usually enough. In enclosed plant rooms with a larger charge an assessment is necessary, because the heavier-than-air refrigerant forms a mixture at floor level.
Polish building regulations impose additional requirements on such rooms, including fire compartment size, construction and Ex-rated equipment. In high-rise buildings and below-ground storeys this can block the intended layout, so it is worth resolving at design stage.
Send us the room plan and installation data. We will tell you whether an assessment is needed and whether classification as an explosion-hazard room can be avoided.