Skip to content

CFD simulations for international projects

Greece, Cyprus, Sweden, Oman, Saudi Arabia, Mexico. Fast turnaround and reports in English, also under a partner's brand.

Piraeus Tower with its glazed façade, seen from the port of Piraeus
Piraeus Tower Piraeus, Greece · Car park smoke control

Selected international projects

Towers, hospitals, shopping centres and car parks from the Mediterranean to the Gulf. Click a card to see the type of analysis.

  • Piraeus Tower with its glazed façade, seen from the port of Piraeus

    Piraeus Tower

    Piraeus, Greece

    Piraeus, Greece2024

    Piraeus Tower

    Office tower, 24 storeys

    Analysis
    Car park smoke control
    Tool
    FDS
    Certification
    LEED Platinum

    What we checked

    • Underground car park smoke ventilation
    • Visibility on escape routes
    • Smoke spread control

    Photo: ArchDaily, photo by Nikos Daniilidis

  • Exterior of the Iulius Mall and Iulius Business Center complex in Cluj-Napoca

    Iulius Mall

    Cluj-Napoca, Romania

    Cluj-Napoca, Romania2024–2025

    Iulius Mall

    Shopping centre, over 240 shops

    Analysis
    Smoke and evacuation
    Tool
    FDS
    Car park
    over 2,000 spaces

    What we checked

    • Smoke control of the atrium and central mall
    • Visibility in the underground corridor
    • Evacuation from the level -1 corridor
    • Car park smoke ventilation

    Photo: Wikimedia Commons, photo by Pasztilla aka Attila Terbócs, CC BY-SA 4.0

  • Aerial photo of the buildings and beaches of the Marassi resort on Egypt's North Coast

    Marassi

    North Coast, Egypt

    North Coast, Egypt2021–2024

    Marassi

    Seaside resort, approx. 6.5 million m²

    Analysis
    Car park smoke control
    Tool
    FDS
    Coastline
    6.5 km

    What we checked

    • Smoke ventilation of building car parks
    • Visibility on escape routes
    • Smoke ventilation performance

    Photo: Emaar Misr official materials (aerial photo of the resort)

  • Front elevation of Mouwasat Hospital in Medina

    Mouwasat Hospital

    Medina, Saudi Arabia

    Medina, Saudi Arabia2018–2019

    Mouwasat Hospital

    Hospital, approx. 55,000 m²

    Analysis
    Car park smoke control
    Tool
    FDS
    Car park
    500 spaces

    What we checked

    • Underground car park smoke ventilation
    • Visibility on escape routes

    Photo: Official material, Mouwasat Medical Services (mouwasat.com)

  • Mouwasat Hospital in Al Khobar, elevation on the entrance side

    Mouwasat Hospital

    Al Khobar, Saudi Arabia

    Al Khobar, Saudi Arabia2018

    Mouwasat Hospital

    Hospital, 220 beds

    Analysis
    Car park smoke control
    Tool
    FDS

    What we checked

    • Underground car park smoke ventilation
    • Visibility on escape routes

    Photo: Mouwasat Medical Services Co. (official material)

  • Exterior of the hospital tower of the Almoosa Specialist Hospital complex in Al-Ahsa

    Almoosa Specialist Hospital

    Al-Ahsa, Saudi Arabia

    Al-Ahsa, Saudi Arabia2020–2021

    Almoosa Specialist Hospital

    Specialist hospital

    Analysis
    Smoke ventilation
    Tool
    FDS

    What we checked

    • Smoke spread during a fire
    • Smoke ventilation performance

    Photo: Hospitals Magazine (editorial materials)

  • Buildings of the King Fahd University of Petroleum and Minerals campus in Dhahran

    KFUPM campus

    Dhahran, Saudi Arabia

    Dhahran, Saudi Arabia2020–2021

    KFUPM campus

    Technical university campus

    Analysis
    Car park ventilation
    Tool
    FDS

    What we checked

    • Car park smoke control during a fire
    • CO dilution in the car park
    • Visibility on escape routes

    Photo: Flickr, photo by xiquinhosilva, CC BY 2.0

  • Al Tijaria Tower residential tower in Manama, seen from street level

    Al Tijaria Tower

    Manama, Bahrain

    Manama, Bahrain2018–2019

    Al Tijaria Tower

    Residential tower

    Analysis
    Car park ventilation
    Tool
    FDS
    Car park
    6 levels

    What we checked

    • Smoke ventilation of the multi-storey car park
    • Visibility on escape routes

    Photo: project materials

  • Reforma Colón building on Paseo de la Reforma, Mexico City

    Reforma Colón

    Mexico City

    Mexico City2018–2023

    Reforma Colón

    Hotel and office building

    Analysis
    Car park ventilation
    Tool
    FDS

    What we checked

    • Underground car park smoke ventilation
    • Car park ventilation refurbishment

    Photo: project materials

Short lead times, European engineering standards

In many European countries a CFD simulation means weeks of waiting. We start within days and model to the requirements of the country where the building stands.

Reports in English
Written in the language of the industry: tenability criteria, ASET/RSET, AOVs. The report goes into your documentation without editing.
Local codes and guidance
For the UK market we model to BS 9991, BS 7346-7 and Smoke Control Association guidance, among others.
Engineers from the Fire University
Simulations are run by fire safety engineers who graduated from SGSP, the Main School of Fire Service in Warsaw, now the Fire University (Akademia Pożarnicza).
Computing power in-house
Our own server room lets us run many scenarios at once, with no queue on an external cluster.

CFD subcontractor to other firms

Most of our international projects were commissioned by companies that deliver solutions to their own clients: manufacturers and suppliers of ventilation systems, design practices and engineering consultancies. For them we are the CFD back office.

We work in the background: the report in the partner's branding, in English, written so that their client accepts it without translation. We work the same way with companies in Poland.

  • Design practices and fire engineers

    We take over the modelling when your own team cannot keep up with the deadlines.

  • Ventilation manufacturers and suppliers

    The simulation confirms the equipment selection and helps win the tender.

  • Main contractors

    Quick verification of changes during construction, before the installation has to be reworked.

Why we are faster

Our turnaround does not come from cutting corners but from computing power and organisation. We have our own high-performance servers and run many buildings on them simultaneously, so where the queue at a CFD consultancy is weeks long, we start within days.

We build models in our own software, WizFDS, and simulations are handled by a dedicated CFD department. In 2025 alone we carried out analyses for more than 700 projects.

  1. 300 multi-threaded processors in our own server room. We do not rent this capacity; it is available immediately.
  2. In parallel we run many buildings at the same time, so a new project never waits in a queue for a free machine.
  3. WizFDS our own software for building FDS models. It shortens the most laborious part of the simulation work.
  4. CFD team a department trained for one task: simulation. It does not split its time across other services.

FAQ

Frequently asked questions

Do you prepare reports in English?

Yes. Reports for international projects are written in English, using the terminology adopted in the country concerned. On request we adapt the layout and visual style to the partner's standard.

Can you work under our company's brand?

Yes, this is a common arrangement. We carry out the calculations and write the report, and the partner passes it to their client as part of their own documentation.

Which requirements do you follow on international projects?

The regulations and guidance of the country where the building is going up, and the design basis agreed with the designer. For the UK market these include BS 9991, BS 7346-7 and Smoke Control Association guidance.

How soon can you start?

Usually within a few days of receiving the data. For urgent deadlines the report can be ready in as little as 5 working days, depending on the size of the model and the number of scenarios.

Have an international project or need a CFD subcontractor?

Describe the building, the country and the deadline. We will reply with the scope and a calculation schedule, in English or Polish.